I would think for a test use V1 and see if he can make a chain. Another member with a 4090 said 32 minutes to make a chain.
If it does make a chain you should see how many hits on a C8.
I only use v1 after the first add of cw my best bet was to run 25 c8 not done. Using 150 gig table first after 7 c8 next 1 nada.
So moved to 600 gig table to do the rest.
150 gig table 139 seconds , 600 gig table 159 seconds with all CP entry was about a hour to do 25 cw.
hope that clarifies...